The Upper/Lower Channel

March

Since the beginning of the year, a team composed of 5 carpenters from Asselin Company works on the upper channel. There are 2 upper channels per mast. In the end, it will be 6 upper channels before the end of April.

plan

Pose porte hauban

Several steps to realize all items:

une console

Consoles

Firstly, we need to make some sconces to support upper channels. For the foremast, carpenters realized 8 consoles for the starboard upper channel. Same for the port. The consoles are nailed and pinned with the hull.

Assemblage porte hauban

Assemblage p.hauban

Secondly, we have to produce platforms by an assembly of 3 encased and bolted parts of oaks.

Pose et fixation

Boards are notched to permit the installation of upper channel.

Porte hauban misaine

A moulding is added on the 3 sides of the upper channel.

Porte hauban tribord

Last step: to fix upper and lower channel by bolting them to the hull avoiding fixings already posed.

 